10 DOCKSIDE EQUIPMENT
Break-off anchorages designed for the nominal load can be provided to
avoid excessive line pull loads from overloading the sheet pile wall.
Apart from bollards along the top edge of the quay wall, it may be
necessary to provide further bollards at various levels depending on the
fluctuations in the local water levels alongside the sheet pile wall.
These mooring hooks are positioned one above the other in the trough
of a sheet pile on both sides of a vertical ladder. They can be bolted or
welded to the sheet pile. Mooring equipment on dolphins comes in the
form of bollards mounted on the top or sides.
Recessed bollard for u- or Z-sections Top bollard for dolphins Side bollard for dolphins