Page 81 - ASF Katalog 2018 en
P. 81

10                                         DOCKSIDE EQUIPMENT










                                                                Break-off anchorages designed for the nominal load can be provided to
                                                                avoid excessive line pull loads from overloading the sheet pile wall.

                                                                Apart from bollards along the top edge of the quay wall, it may be
                                                                necessary to provide further bollards at various levels depending on the
                                                                fluctuations in the local water levels alongside the sheet pile wall.

                                                                These mooring hooks are positioned one above the other in the trough
                                                                of a sheet pile on both sides of a vertical ladder. They can be bolted or
                                                                welded to the sheet pile. Mooring equipment on dolphins comes in the
                                                                form of bollards mounted on the top or sides.


































             Recessed bollard for u- or Z-sections  Top bollard for dolphins        Side bollard for dolphins


































                                                                                                   mail@asf-anker.de   |   81
   76   77   78   79   80   81   82   83   84   85   86